Maintaining the FastIron GS Hardware
September 2007 © 2007 Foundry Networks, Inc. 7 - 5
5. Press the two latches near the edges of the supply outward to lock the supply in place.
6. Replace the power supply locking screw.
7. Power on the supply and verify that it is working properly as instructed in “Powering On the System” on
page 3-14 and “Verifying Proper Operation” on page 3-15.
DC Power Supplies
Use the following procedures for DC power supplies in FGS devices.
WARNING: Before beginning the installation, see the precautions in “Power Supply Precautions” on page 3-4.
You will need the following tools to perform these procedures.
Retaining Bale AC Power Cord